Environmental Product Declarations

Your EPD. Or all eighty+ of them.

Bring the declaration stuck in the too-hard pile, or a whole family that has to agree. You get it verification-ready, at a fixed price, for a fraction of consultancy cost.

  • Single products and whole product families
  • Built to pass independent verification first time
  • Verification and publication coordinated for you
Why you're being asked

EPDs are now the price of entry.

  • A specifier or contractor wants one
  • A tender scores embodied carbon
  • You need a database or programme listing
  • A retailer or OEM has made it a condition of supply
What you get
  • The underlying LCA, built to your PCR
  • The declaration, in your programme's format
  • Independent verification arranged for you
  • Publication with your programme operator
Why the Factory

Where others stall, your EPD gets made.

Difficult products

Multi-material assemblies, co-products and unusual process routes are what the line is built for.

Whole families

One reference model, many variants. Your tenth declaration is made exactly like your first, for far less.

Rules read right

Correct PCR interpretation keeps your declaration from bouncing back at verification.

More detail
Programme routes and PCRs

Your declaration can go through EPD Hub, MRPI, the Dutch NMD, IES and other programmes. The right route isn't always the one your customer named, so it's confirmed with you at scoping. Core and complementary PCR requirements are read for your product, not assumed.

Portfolio EPD programmes

Shared models, shared site and energy data, one method and one report format across your range. Your declarations agree with each other, and every extra product costs you less. Any pre-verified tool route available through your operator is checked at the outset.

Methodology credentials

Through project relationships, our practitioners have worked on Dutch NMD Category 3 reference-product methodology. That's representative product architectures and decisions built to withstand close scrutiny. This is not a claim of government appointment, accreditation or pre-verification approval.

What you need to start

The request itself (specification, tender or email), the products to cover, a BOM or formulation for a representative product, how and where it's made, any existing data and your programme operator if one is named. Send what you have and the rest is established with you.

Standards ISO 14025 + applicable PCR/programme rules · EN 15804+A2 for construction products · ISO 14040/44Verification Independent third partyHow it works →Job Cost →

Get your declarations moving.

Talk Get a quotation